The longest tunnels in Italy: a clear guide
Italy has some of Europe’s most important road and railway tunnels. The Alps and Apennines make underground routes essential for national travel and cross-border connections. However, tunnel rankings can be misleading when they mix tunnels already open to traffic with major projects still under construction, or when they compare a single tunnel bore with a wider tunnel system.
This guide separates operational tunnels from projects that are not yet in service. Among railway tunnels entirely within Italy, the Vaglia Tunnel on the Bologna–Florence high-speed line is about 18.7 kilometres long. The Brenner Base Tunnel is a much larger cross-border project: its main tunnel will be 55 kilometres long and the wider connection reaches 64 kilometres when the existing Innsbruck bypass is included. It is not open to regular traffic yet. Recent project forecasts published in October 2026 set the start of regular service for 2034. Read the latest Brenner Base Tunnel schedule update.
How tunnel rankings should be read
A tunnel may be counted as a single bore, a pair of parallel tubes or part of a larger system. Cross-border tunnels also have sections in more than one country. A railway tunnel may be used by passenger and freight trains, while a road tunnel has separate operating and safety rules. This article gives the length of the relevant tunnel or system and identifies whether it is operational or still being built.
Lengths are rounded because different project sources may describe the main bore, the full system or connected approaches. For travel planning, exact engineering measurements are less important than knowing whether the route is open, whether it is a road or rail link, and whether you need current traffic information.
Long railway tunnels already in operation
| Tunnel | Approx. length | Route | Status and note |
|---|---|---|---|
| Vaglia Tunnel | 18.7 km | Bologna–Florence high-speed railway | Operational; longest railway tunnel entirely in Italy |
| Apennine Tunnel (Galleria dell’Appennino) | 18.5 km | Historic Bologna–Florence railway | Operational; opened in 1934 |
| Fréjus / Frejus rail tunnel | About 13.7 km | Italy–France railway | Operational international rail connection |
| Mont Cenis / Frejus rail link | Cross-border system | Piedmont and France | Do not confuse with the Frejus road tunnel |
The Vaglia Tunnel carries high-speed trains beneath the Apennines between Bologna and Florence. It forms part of a railway line that is mostly underground. Its length is commonly cited as 18,713 metres. The historic Apennine Tunnel on the older route is slightly shorter, at about 18.5 kilometres. The two tunnels belong to different railway lines and were built in different eras.
International railway tunnels create a further comparison issue. The Simplon and Fréjus rail tunnels cross national borders, so they should be described as cross-border links rather than as tunnels wholly inside Italy. A ranking that includes every tunnel partly in Italy will differ from one restricted to tunnels entirely on Italian territory.
Major road tunnels in and near Italy
| Road tunnel | Total length | Countries | Notes |
|---|---|---|---|
| Frejus Road Tunnel | 12.87 km | Italy–France | Longest of these major road tunnels; two-tube configuration |
| Mont Blanc Tunnel | 11.61 km | Italy–France | Important Alpine road crossing |
| Gran Sasso Tunnel | About 10.2 km per main route | Italy | On the A24 through the Apennines |
The Fréjus and Mont Blanc tunnels are international road crossings. Their full lengths cross the border, so only part of each is in Italy. Frejus Tunnel operators report a total length of approximately 12.87 kilometres. See the Fréjus tunnel operator’s current information. The Mont Blanc tunnel is about 11.6 kilometres long. Road users should check live traffic, maintenance closures, tolls and vehicle rules before departure.
Projects not yet open to regular traffic
Brenner Base Tunnel
The Brenner Base Tunnel connects Fortezza in Italy with Innsbruck in Austria. Its main railway tunnel is 55 kilometres long. Including the existing Innsbruck bypass, the underground rail connection is 64 kilometres. That figure is the future total route, not the length of a single newly excavated bore. The project is designed to provide a lower-gradient railway crossing beneath the Brenner Pass and support a shift of freight from road to rail.
Construction has reached major milestones, but completion of the excavation does not mean trains can immediately use the route. Railway systems, testing, approvals and trial operations are also required. The project company’s October 2026 update forecasts regular service in 2034. Earlier pages and older maps may show a different target year, so use the latest project communication when discussing the opening date. Read the project overview from BBT SE.
Terzo Valico dei Giovi
The Terzo Valico dei Giovi is a major railway project intended to improve connections between Genoa, northern Italy and European rail corridors. Its longest tunnel section is planned at roughly 27.5 kilometres, but it is a construction project rather than an operational passenger tunnel. A source describing it as Italy’s longest railway tunnel is referring to the planned project when complete, not a tunnel currently used by ordinary trains. Check the project authority’s latest reports for progress and target dates.
These projects show why a simple list titled “the longest tunnels in Italy” needs a status column. A future tunnel may be longer than every operating tunnel, but it does not yet serve as a route for travellers.
Why does Italy have so many tunnels?
Italy’s mountainous geography separates regions and creates bottlenecks for roads and railways. The Alps form a barrier along the northern frontier, and the Apennines run down much of the peninsula. Tunnels shorten routes, reduce steep gradients and connect valleys that would otherwise require long journeys over mountain passes.
Rail tunnels are particularly important for freight and passenger connections across the Alps. A flatter railway route can improve travel times and make rail more competitive with road transport. Road tunnels remain vital for tourism and trade, but they also require strict safety systems, ventilation, emergency exits, traffic management and regular maintenance.
What is it like to travel through a long tunnel?
Most visitors experience Italy’s tunnels as part of a road or train journey rather than as tourist attractions. On a train, the longest tunnel sections may last several minutes in darkness, with little to see outside. On a motorway, drivers should keep a safe distance, obey speed limits, use lights as required and follow lane and signage instructions. Do not stop inside a tunnel unless there is an emergency or an instruction to do so.
Some mountain journeys include several tunnels in quick succession. Drivers who are uncomfortable in enclosed spaces may prefer to plan breaks before or after the tunnel section, rather than stopping where stopping is prohibited. For passenger rail routes, check whether a connection requires a transfer; the tunnel itself is not a separate visitor destination.
Road tunnel safety and travel planning
Before a long drive, check whether the tunnel operator has announced maintenance, restrictions or closures. Alpine crossings can be affected by traffic peaks, weather and scheduled work. Keep enough fuel and battery charge for the full journey and avoid entering a tunnel if your vehicle has a warning light or a serious mechanical problem.
Inside a road tunnel, follow posted instructions and leave emergency lanes clear. If traffic stops, keep a safe distance and listen for announcements. Use emergency phones or marked call points if needed. Do not reverse or turn around. In a serious incident, follow the tunnel’s escape signs and the instructions of emergency staff.
Rail tunnel travel in Italy
Passengers do not normally need to do anything special when a train enters a tunnel. Long railway tunnels are equipped for train operation and emergency procedures, and passenger services follow the railway operator’s rules. If you are planning a route through the Alps, compare journey times and connections rather than choosing a service solely because it passes through a record-length tunnel.
The Bologna–Florence high-speed line is a useful example: the Vaglia tunnel is one element in a wider route designed to cross the Apennines efficiently. The historic line follows a different alignment and may serve different stations. Check the service and ticket conditions for your actual destination.
Where are Italy’s most important tunnel regions?
Many major routes pass through the northern regions. The Brenner corridor connects South Tyrol with Austria; Fréjus connects Piedmont with France; and Mont Blanc links the Aosta Valley with the French Alps. The Gran Sasso tunnel lies on the A24 in Abruzzo. The Bologna–Florence railway tunnels cross Emilia-Romagna and Tuscany.
These regions offer very different travel experiences beyond the infrastructure. Read our guides to Trentino–Alto Adige, the Aosta Valley, Piedmont and Emilia-Romagna. If you are driving across the Alps, plan overnight stops according to route length, not simply tunnel location.
Plan experiences in Italy
If your route includes a stop in a city or mountain region, compare local attractions and guided experiences for your dates.
Frequently asked questions
What is the longest railway tunnel currently operating entirely in Italy?
The Vaglia Tunnel on the Bologna–Florence high-speed line, at about 18.7 kilometres, is commonly identified as the longest railway tunnel wholly within Italy.
Is the Brenner Base Tunnel open?
No. It is under construction and not open to regular train traffic. The project company’s October 2026 forecast sets regular service for 2034.
How long is the Brenner Base Tunnel?
The main tunnel is 55 kilometres. The 64-kilometre figure includes the existing Innsbruck bypass as part of the wider underground connection.
What is Italy’s longest road tunnel?
The Fréjus road tunnel is about 12.87 kilometres in total length, crossing the Italy–France border.
Is the Mont Blanc Tunnel in Italy?
It is a cross-border road tunnel shared by Italy and France. Its total length is about 11.6 kilometres.
Further reading
For more Italian geography, see our guides to the highest mountains, largest provinces and highest volcano. For travel through the northern regions, explore Bolzano and the Aosta Valley.
Find a place to stay along your route
Compare accommodation in the regions you are travelling through and check parking, access and cancellation terms.
Railway and road tunnels are not directly comparable
A road tunnel is designed for vehicles, with ventilation, traffic control and emergency refuges intended for drivers and passengers. A railway tunnel is designed around train operations, track geometry, power supply and rail-specific evacuation procedures. Comparing the total length of a twin-bore railway system with one road tube can make the railway appear categorically “longer” without explaining what is being counted. This page therefore identifies the type and status for each example instead of placing every tunnel in a single unqualified top ten.
Cross-border structures add another complication. The Fréjus road tunnel and Mont Blanc tunnel are shared by Italy and France; their full lengths are not inside Italy. Likewise, railway crossings such as the Fréjus rail tunnel connect two countries. If a ranking is limited to tunnels wholly within Italian territory, these international structures should be described separately.
Why the Brenner project is more than one bore
The Brenner Base Tunnel is a system with two main railway tubes and an exploratory/service tunnel, connected by cross passages. The 55-kilometre figure refers to the core route between Fortezza and Innsbruck. The often quoted 64 kilometres includes the already existing Innsbruck bypass on the northern side. Some project descriptions give a much larger number for all excavated galleries and connecting works; that is not the distance a train will travel through one continuous main bore. For public travel, the service opening date matters more than the excavation milestone.
The October 2026 schedule revision is particularly important for this article because it differs from older target dates. Planning documents and tourism pages written before this update may still repeat the earlier estimate. Recheck the project company’s newsroom before citing a target year in future.
Check before travelling
For road trips, look up live operator notices and traffic conditions before departure. For rail trips, consult the train operator for service changes. Construction schedules and opening forecasts are not live travel timetables, and dates may be revised as project work continues.